The following are the inspection procedures.

  • No permit will be issued until permanent lot pins or monuments are in place
  • No permit will be issued until a curb (where applicable) elevation is obtained and marked on site
  • The following phases of construction require a call for inspection by the builder.  At least twenty-four hours notification is required.
    1. Footings (includes excavation, casting forms, rebars, etc.)
    2. Foundation (including bolt replacement, damp-proofing and/or water-proofing).  If foundation is backfilled without an inspection, it will be required to be dug out and work will be stopped until an inspection is made.
    3. Framing - includes nuts and washers on sill plates.
    4. Rough plumbing - walls will be required to be reopened if the rough plumbing has not been inspected.
    5. Insulation - insulation inspections will use Act 222 - The Building Energy Conservation Act.
    6. Sewer hookup and air test
    7. Final - upon completion of project
  • Any of the above inspections that are not called for will result in the dismantling of any construction necessary to make these inspections.
  • Curbing (where required) on all street frontages, and paved driveways must be constructed prior to the issuance of a certificate of occupancy or the use or occupancy of any newly constructed principal use structure on any building lot.

 

 

 

 
         
   
Information on the Palmer Township web site is provided as a service to the community. While every effort has been made to ensure the accuracy of the information contained within this site, official documentation is maintained by and is available from the Township office.
Copyright 2004 - 2005 Palmer Township, PA. All rights reserved. Page last modified January 14, 2005
   
     
Web Design and Graphics by Bob Lammi
Hosted by Accufind